With electric vehicles becoming increasingly popular in the UK, having a home charging point is essential for EV owners. Installing a dedicated home charger is far more convenient and cost-effective than using a three-pin plug.
Typical Installation Costs
Home EV charger installation in the UK typically costs between £700 and £1,200, including the charger unit and professional installation. This includes:
- The wall-mounted charging unit
- All necessary cables and connectors
- Installation on a dedicated circuit
- Testing and commissioning
- Wall box or pedestal mounting
Types of EV Chargers
There are three main types of home EV chargers:
- 3-pin plug (slow charging) – Uses a standard socket but is slow (8–12 hours for full charge). Not recommended for regular use.
- 7kW charger (fast charging) – Most popular option. Charges a typical EV in 4–8 hours. Requires dedicated 32A circuit.
- 22kW charger (rapid charging) – Requires three-phase power supply. Charges in 2–4 hours. Most homes don't have three-phase power.
Popular UK Brands
Popular EV charger brands in the UK include:
- Ohme – Smart chargers with load balancing
- Zappi – Eco-friendly chargers with solar integration
- Pod Point – Widely available with smart features
- Wallbox – Premium chargers with power sharing
- Myenergi – Solar and battery integration
OZEV/LEVI Grant
The Office for Zero Emission Vehicles (OZEV) provides a grant of £350 off the cost of a home EV charger. To qualify:
- You must have off-street parking
- The charger must be installed by an OZEV-approved installer
- The charger must be on the approved list
- You must own or lease an eligible electric vehicle
What Installation Involves
A typical EV charger installation includes:
- Survey of your electrical installation
- Installation of a dedicated circuit from the consumer unit
- Running cable to the charger location
- Mounting the charger unit
- Connecting and testing the charger
- Registration with the local distribution network operator
How Long Does Installation Take?
Most EV charger installations take between 2 and 4 hours. If your consumer unit needs upgrading or additional work is required, it may take longer.
Getting Quotes
Always use an OZEV-approved installer who can help you claim the £350 grant. Get quotes from at least three installers and ensure they include the charger unit, installation, and any necessary electrical upgrades.